On 20 November 2026 the Yingde City urban management and enforcement bureau in Guangdong issued a tender for street lighting energy management: a total budget of RMB 202.562 million, a ten-year service period, and more than 150,000 street lights across the city. The model is energy performance contracting — private capital funds the retrofit and operates the system for its full life, recovering the investment from saved electricity and maintenance costs.
The qualification requirements set the bar: bidders need Grade I contracting status for urban and road lighting (or Grade A for building mechanical and electrical works) plus a safety production licence, a project manager holding a Grade I registered constructor certificate and a Class B safety assessment pass, and consortia of no more than two members. This is not a project that ends with a shipment of luminaires; the winner is answerable for light output for a decade.
Swap street lights for downlights and spotlights and the logic is identical. Once a ten-year contract is signed, the buyer is no longer purchasing watts and lumens but how much light remains in year ten. What the manufacturer must supply changes with it: LM-80 and TM-21 lumen depreciation reports need measured data behind them rather than a nominal 50,000 hours; drivers must be replaceable on site, because over ten years it is the power supply that fails, not the light source; tooling and BOM for a given model must stay stable for a decade, or a year-three reorder will not match in colour; and batch-to-batch colour tolerance must be held, or replacing half the fixtures on one street will show the difference.
For Yingde, 150,000 lights, RMB 200 million and ten years works out at roughly RMB 135 per light per year, retrofit capital and maintenance included. That number is a reminder for manufacturers: low-bid awards hold up over short cycles and fail over ten-year ones — one full-batch rework can consume the entire margin.